Large-scale battery storage projects

Grid compliance is not a supplier's assurance. It is a calculation.

End-to-end delivery of storage projects: from the initial grid calculation to the TR3 verification measurement. We resolve interface conflicts, coordinate the construction schedule and reduce risks – across all power classes, from 5 to >500 MW.

Where storage projects lose capital

Isolated specialist planning is the biggest risk for large-scale storage. Inconsistencies between delivery scopes lead to catastrophic delays.

  1. Incomplete scopes

    When delivery boundaries between construction, electrical works and the grid operator blur, change orders explode. We define watertight interfaces up front.

  2. Grid connection and connection guidelines

    Grid operators' specific requirements and complex PQ requirements (VDE-AR-N-4110/4120/4130) are often recognised too late. We check these parameters proactively.

  3. Trade synchronisation

    Civil works, medium voltage and secondary systems often operate in silos. We orchestrate the schedules and uncover inconsistencies before construction progress stalls.

The three-phase safety net

We bring your large-scale BESS projects safely onto the grid.

Three phases in which technical decisions become irreversible. In each of them we check against the standard and against your capital, not against a supplier's interest.

  1. Load profile analysis and assessment of grid capacity at the connection point. Short-circuit and load flow calculation, harmonic forecast. Optimisation of the single line diagram. Review of supplier documentation for compliance with standards - before the contract is awarded.

    Load flow and short-circuit calculation for the design of a battery storage system
  2. Technical site supervision against the approved design. Continuous interface planning between trades. Claim and variation management on documented technical grounds rather than on negotiating skill.

    Technical construction supervision on the site of a large-scale battery storage project
  3. Commissioning coordination, support through unit certification, verification measurement to FGW TR3. Power quality measurement at the operating point. The plant goes onto the grid because it is demonstrably compliant.

    Power quality verification measurement to FGW TR3 at the grid connection point
Project recovery

When the project stalls before the storage plant stands.

Deadlocked negotiations, disputed supply boundaries, looming contractual penalties: what is missing in these situations is rarely an opinion, but an independent measurement. At short notice we step in as a neutral technical authority, record the actual condition of the plant and put the facts on the table on which negotiations can resume. We represent no supplier - including ourselves as one.

Free initial assessment

Start the project evaluation

Three short steps to the key technical parameters of your BESS project. We check them against the relevant connection guidelines and get back to you with a well-founded initial assessment – independent and free of any sales interest.

Non-binding & free of charge
No commitment, no sales call.
Strictly confidential
Your project data stays with us.
Response within 48 h
Personally, from one of our engineers.

Project scope

1. Key data of your storage project

Planned connection capacity of your BESS project.

Voltage level of the grid connection

2. Technical framework

Do you need support with VDE-AR-N 4110/4120, HV/MV topics (40-ohm criterion) or certifications?

3. Your project & contact

We use your details solely to process this enquiry.

Enquiry submitted successfully

Thank you for your trust. A member of our BESS taskforce will get back to you shortly with an initial assessment.